A reinsurance agreement has been concluded between the Nuclear insurance pool of Ukraine and the Belarusian nuclear insurance pool, according to which the Belarusian nuclear insurance pool accepts reinsurance the share in possible losses under of compulsory third party liability insurance of SE “NNEGC “Energoatom” for legal liability incurred by the insured as a result of nuclear accident at nuclear installations specified herein below and/or during transportation of nuclear material to nuclear installation of the operator, after he accepted the liability for this material from the operator of another nuclear installation, or during transportation from the nuclear installation of the operator if the liability for the nuclear material was not accepted by another operator.
List of reinsured nuclear installations:
– Zaporizhzhya NPP
– Rivne NPP
– South-Ukraine NPP
– Khmelnitsky NPP